← Collection16 — USACE Mechanical Unloading Program
16 / Civil & MarineMississippi & Minnesota River System · 2026
Marine
Program.
Federal Program / Planning & Controls
Selected Projects · 16 / 16
WORKS ATLAS / 16
USACE Mechanical Unloading ProgramMississippi & Minnesota River System / 2026
01 — The Project
Building the planning and controls behind a multi-year federal marine program.
Developed pre-execution safety and contractor quality-control plans for the USACE Mechanical Unloading IDIQ 2026–2029.
Updated APP and CQC materials, schematic plans, and field reporting workflows. This work concerned pre-execution planning, not a claim of completed field construction.
ProjectUSACE Mechanical Unloading Program
LocationMississippi & Minnesota River System
Assignment2026
Field affiliationLegacy Corporation of IL / Program Planning
03 — Professional Contribution
A contribution within
a larger effort.
- 01
Accident-prevention planning
Updated APP requirements against EM 385-1-1 and marine-specific risk controls.
- 02
Contractor quality controls
Reworked CQC plans covering DFOWs, responsibilities and Three-Phase Control.
- 03
Schematic and reporting workflows
Developed reusable planning exhibits and reporting templates.
The scale is architectural.
The work is human.
Major infrastructure takes shape through many disciplines, shared responsibilities, and the work of field teams.
USACE Mechanical Unloading Program / Multiple States