← Collection16 — USACE Mechanical Unloading Program
16 / Civil & MarineMississippi & Minnesota River System · 2026

Marine
Program.

Federal Program / Planning & Controls

Selected Projects · 16 / 16
01 — The Project

Building the planning and controls behind a multi-year federal marine program.

Developed pre-execution safety and contractor quality-control plans for the USACE Mechanical Unloading IDIQ 2026–2029.

Updated APP and CQC materials, schematic plans, and field reporting workflows. This work concerned pre-execution planning, not a claim of completed field construction.

ProjectUSACE Mechanical Unloading Program
LocationMississippi & Minnesota River System
Assignment2026
Field affiliationLegacy Corporation of IL / Program Planning
03 — Professional Contribution

A contribution within
a larger effort.

  1. 01

    Accident-prevention planning

    Updated APP requirements against EM 385-1-1 and marine-specific risk controls.

  2. 02

    Contractor quality controls

    Reworked CQC plans covering DFOWs, responsibilities and Three-Phase Control.

  3. 03

    Schematic and reporting workflows

    Developed reusable planning exhibits and reporting templates.

Works Atlas / Project Perspective

The scale is architectural.
The work is human.

Major infrastructure takes shape through many disciplines, shared responsibilities, and the work of field teams.

USACE Mechanical Unloading Program / Multiple States