Lake Mariner is a major AI/HPC campus in Barker, New York. During a September 2026 assignment, work covered active construction zones associated with CB-4 and CB-5 and related campus infrastructure.
The site brought electrical construction, energization, LOTO, commissioning interfaces, and multiple contractors together within a rapidly developing mission-critical environment.
The architecture of
critical infrastructure.
Scale, geometry, atmosphere, and the systems behind the built environment.
Embedded in the work.
Focused on execution.
- 01
Field safety and work-zone presence
Provided daily field safety coverage across active work areas, engaging electrical crews on access, work-at-height, simultaneous operations, and changing site conditions.
- 02
Work planning and JSA review
Reviewed Ferguson job safety analyses and discussed tasks, conditions, hazards, and protective measures with crew personnel.
- 03
Energization and LOTO interface
Worked alongside energization and LOTO personnel, observing isolation-status communication, work boundaries, lockbox arrangements, and commissioning handoffs.
- 04
Documenting field conditions
Prepared structured, photograph-supported daily field safety reports for follow-up and management review.